Wednesday 2 October 2013

Review of Our Progress

02/10/2013

On Monday of this week Meg created a post titled 'To Do List'- allowing the group to see what work was left to be completed. From reviewing the list it is evident that we have used our time effectively and remained productive in order to get the tasks completed. Our priority this week has been the storyboard and animatic- both of which have now been completed and are up on our blog. This is incredibly useful as it means that we are now more organised in terms of our pre production for the music video.

There were also numerous smaller jobs which needed to be completed such as the risk assessment, location post, feedback from pitch and a list of items to take. All of these tasks are also finished and have been published below.

Our date for filming is the 8th of October so it is essential that we are fully prepared by that date, we have aided our preparation by doing some test shoots with the camera- this will be particularly helpful to Meg who has been assigned the role of camerawoman for the project. In terms of costumes for the band, we have arranged outfits for both Ellie and Alex and will be taking suitable make up and hair products to use on the day of filming.

We are now all up to date with the work we were aiming to have finished and the list below displays the tasks we are proceeding to work on.

To do- commencing 02/10/2013

- Consider representations in your music video
- Apply relevant narrative theorist to your music video
- Introduction to digipak/ website/ advert
- Research CD covers, band websites, magazine adverts- detailed annotation/ analysis